
Day
1.
All sill plates
installed and both gables erected and braced off

Day 2 & 3.
All wall panels
installed and ridge beam set.

Day 4.
All roof panels
installed, garage ready for roofing, siding and windows.

Finished garage with a R-Value of 25 wall and roof panel system.
** Options: Basic garage can be adapted to have second floor, this is ideal for an office or workshop.
Contact Branch River @ 401-232-0270 or fax us a scetch 401-231-3434
|
Home | Panels | Geofoam | Packaging | News | Projects | Contact us |
|
|
|
© 2004 Branch River
Plastics |